In a bold move towards sustainable and cost-effective energy solutions, Professional Energy Solutions (PES) has recently completed a remarkable 1.1 MW solar project. This impressive endeavor arose from the pressing challenge of escalating electricity costs, with conventional diesel generators costing an exorbitant 70 rupees per unit while grid electricity was also steadily rising at 45 rupees per unit. Faced with these financial constraints, the client approached PES for an alternative energy solution.
PES responded with a practical and sustainable plan, advising the installation of a 1 MW solar power system. The results were nothing short of transformative, yielding significant monthly savings. This solar project produced 3,800 units per day, resulting in 114,000 units per month, translating to an impressive 1,368,000 units annually. The payback period, initially estimated to be more than three years, was dramatically reduced to just two years after a mere year of operation, marking a remarkable 50% recovery of the investment.

Professional Energy Solutions’ 1.1 MW Solar Project Anniversary: A Triumph in Commercial and Industrial Solar Installations

PES’s solar solution not only alleviated the financial burden but also had a profound impact on the environment. The potential carbon emissions saved were substantial, with 1 unit of electricity produced from solar panels saving 41 grams of carbon dioxide. Over a 25-year period, this translates to a remarkable 61.82 tonnes of carbon dioxide emissions saved.
However, the journey to this remarkable achievement was not without its challenges. The project’s installation posed several obstacles, which the PES team adeptly overcame. The height of the shed and the angle required for optimal sunlight exposure demanded careful design and execution. The safety of the team was a top priority, with walkways designed to ensure easy access and safety around the shed.
Another challenge lay in the delivery of pallets to the roof, which was accomplished by installing temporary elevators. Guard grills and safety grills were meticulously installed, adhering to the highest safety standards. An aluminum structure was designed to protect the shed and its machinery, with silicon and epoxy filling to prevent leakage.
Electrical issues were also addressed, with innovative solutions such as pre-installation of electrical wires to accommodate MC4 connectors. Galvanized iron cable trays were employed for transporting streams to the inverter rooms.

Rrsidential Solar Installations

The solar panels and inverters used in the project were of the highest quality, featuring tier-1 Huawei and Canadian Solar components with top-rated breakers. This ensured optimal performance and reliability of the system.
Furthermore, PES recommended a larger transformer installation and applied for a green meter to enhance the efficiency of the project. The entire energy system was synchronized through a robust Control and Monitoring Technology (CMT) to prioritize solar, followed by grid electricity and then a generator, ensuring a seamless and efficient energy supply.
Professional Energy Solutions’ outstanding work was not only commended for its technical excellence but also for its commitment to after-sales service. The team consistently provided quarterly reports on solar production and system efficiency, remained readily available for assistance.

Located in a remote area in Bhalwal, the project faced logistical challenges, but PES overcame them by implementing a phased supply approach, successfully completing the entire project in just two months.
In the end, PES has not only provided a cost-effective and sustainable energy solution but also demonstrated its commitment to environmental responsibility and client satisfaction. The 1.1 MW solar project stands as a beacon of hope in a world striving for cleaner and more affordable energy alternatives.

Overcoming Installation Challenges: Professional Energy Solutions’ Remarkable Solar Project

The completion of Professional Energy Solutions’ (PES) 1.1 MW solar project was not only a triumph in sustainable energy but also a testament to the company’s unwavering commitment to tackling installation challenges head-on. This article delves into the various hurdles the PES team faced during the implementation of this pioneering project.

1. Maximizing Sunlight Exposure for Industrial Solar Installation

One of the key challenges that the PES team encountered was the height and tilt angle of the shed on which the solar panels were to be installed. To harness maximum sunlight, the technical team had to design a structure that accommodated these conditions while ensuring safety remained paramount. A thorough shed design and load-bearing analysis were carried out to ensure compatibility with the rail-type structure being installed.

2. Safety First in Commercial Solar Installations

Safety was a top priority for PES, considering the challenging height of the shed and its remote location. To mitigate risks, the team meticulously designed walkways to enable safe access around the shed, ensuring there were no hazards for the personnel involved in the project.

3. Handling Pallet Deliveries for Solar Panel Installation

Transporting the solar panels to the roof of the shed posed yet another significant challenge. The team opted for a practical solution to tackle this issue. The shed’s roof lacked the load-bearing capacity to support pallets, so PES resorted to using temporary elevators to efficiently shift individual panels to their designated positions on the roof.

4. Ensuring Safety Standards in Solar Power Installation

Safety remained at the forefront of the project’s execution. To protect the engineering team, the project incorporated various safety measures, including guard grills, safety grills, and HSSE gadgets. These safety standards were rigorously followed to ensure the well-being of the team.

5. Protecting the Roof and Machinery in Solar Panels Installation

The installation of the rail-type structure presented another dimension of the challenge. An aluminum structure was meticulously designed and installed on the shed to ensure that the shed itself was not damaged, and the machinery underneath remained secure. Additionally, silicon and epoxy filling were employed to guarantee there was no risk of leakage, providing a watertight and secure environment.

6. Addressing Electrical Issues

Practical issues concerning electrical components were also expertly resolved. The MC4 connectors on the panels lacked space beneath for wire crossings. To address this, the team attached wires to the panels before installing them on the rail-type structure, ensuring the system’s electrical integrity.

7. Efficient Energy Flow in Solar Energy Companies

To facilitate the flow of energy, galvanized iron cable trays were employed to transport the energy streams to the inverter rooms, ensuring a seamless energy supply throughout the system.

The completion of PES’s 1.1 MW solar project showcases not only a remarkable achievement in sustainable energy but also the company’s unwavering commitment to safety, efficiency, and excellence in addressing complex installation challenges. In the end, it stands as a shining example of how innovative solutions and meticulous planning can transform the energy landscape.

 

home solar system

Client Testimonial: PES’s Exceptional Service Leaves a Lasting Impression

Mr. Mukhtar Cheema, the Project Head at Hunza Citrus, expressed his complete satisfaction with the exceptional service provided by the team at Professional Energy Solutions (PES). In a glowing testimonial, Mr. Cheema highlighted several key factors that made the PES team stand out.

1. Timely Project Completion and Planning in Commercial Solar Installations

One of the cornerstones of a successful project is adhering to timelines, and Mr. Cheema commended PES for their timely project completion and meticulous planning. This aspect is crucial in ensuring that clients can benefit from their investments promptly and efficiently.

2. Exceptional After-Sales Service in Solar Panel Company

However, the exceptional service extended beyond project completion. Mr. Cheema praised PES for their remarkable after-sales service. He noted that the team consistently provided quarterly reports detailing solar production and system efficiency. This ongoing support allows clients to monitor the performance of their solar installations and make informed decisions.

3. Availability and Support from Professional Energy Solutions

Furthermore, Mr. Cheema highlighted the team’s availability and commitment to assisting clients. PES’s readiness to provide help and assistance whenever needed underscores their dedication to customer satisfaction.

In Mr. Cheema’s eyes, PES has not only delivered a successful solar project but has also demonstrated a commitment to their clients’ long-term satisfaction. This client testimonial serves as a testament to PES’s dedication to providing top-tier service throughout the entire project lifecycle and beyond.